Tennet – animation drilling Maasgeul
We have made an animation for the controlled drilling of four pipelines under the seawall at the south side of the Maasgeul. This operation is carried out by LMR Drilling GmbH for Tennet. The pipelines ensure a safe connection of the HKZ Alpha and Beta cables to the Maasvlakte high-voltage station.
We have visualised the invisible and explained the operation in a short animation.